UAN: +92 (055) 111-666-000
info@dhagwa.com
Home
Events
Image Gallery
Video Gallery
E-Services
Payment Voucher
Dealers Registration
Forms
Building Control By Laws
Procedures
Projects
News Flash
Map
Dealers
Registered Dealers
BlackListed Dealers
Contact Us
Auction
Member Login
Building Control
By Laws
Possession Mechanism
Regulations ByLaws (2022) C
Major Points of By Laws
List of Charges
Forms
Steps for Building Construction in DHA Gwa
Possession Mechanism
DHA Gujranwala Regulations 2022 (Bye-Laws)
Spec Power of Attorney (Members Living in Pakistan)
Spec Power of Attorney (Members Living Abroad)
Major Points of Bye-Laws
List of Charges
Application of possession of plot (Site Plan) - LEGAL
Application for Soil Investigation Report
Architect Registration
Structure Engineer Registration
Subdivision of Plots & Houses
Amalgamation of Plots
Drawing Submission (Complete Set with Undertakings)
Architecture Stability Cert (Drawing Submission)
Structure Stability Cert (Drawing Submission)
Demarcation
Revised Drawing
Temporary Sewerage Connection
Temporary Water Connection
Temporary Electrical Connection
Application for Installation of Solar System
New Water Sewerage Connection
Completion Certificate
Demolition of House or Building
Irrevocable Undertaking for Commercial Building
Demolition of House or Building
Irrevocable Undertaking for Commercial Building
Irrevocable Undertaking for Residential-Building
NOC For Generator Installation (required by owner for resident)
Undertaking for Basement Commercial
Undertaking for No Claim Services
Undertaking for Second Stair of Basement
Undertaking for Septic Tank
Undertaking for Staking of Material Temporary Hut
Undertaking Generator Installation
Undertaking sitting roof requirment
Use of Mechanical Excavator
Generator Installation Commercial
Sample for Method of Basement Construction
Steps for Building Construction in DHA Gwa
Urdu Instrcution for Commercial Const
Advertisement firms
Scroll